Skip to main content
Oct
03

Portland port obtains federal grant to upgrade security

Rail News Home Security 10/3/2017 Rail News: Security
Terminal 6 is on the Columbia River.Photo – Port of Portland

The Port of Portland will receive a $1.25 million federal grant to upgrade marine terminal security systems.

The port will use the grant to rebuild key components of the security systems at terminals 4 and 6, port officials announced in a press release.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

California high-speed rail agency invests recovery dollars on schedule

Rail News Home High-Speed Rail 10/3/2017 Rail News: High-Speed Rail
The authority has released a report that details how it spent recovery funds since 2009.Photo – California High-Speed Rail Authority

The California High-Speed Rail Authority (CHRSA) has finished investing $2.55 billion worth of American Recovery and Reinvestment Act (ARRA) funds by the required Sept. 30 deadline.

The agency released a report that details how it spent the ARRA funds. A little more than $2 billion went toward construction of the Central Valley segment.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

MBTA trims expenses in FY2017

Rail News Home Financials 10/3/2017 Rail News: Financials
The agency's structural deficit decreased 65 percent year over year.Photo – MBTA

The Massachusetts Bay Transportation Authority (MBTA) reduced its structural deficit by 65 percent in fiscal-year 2017 compared with the previous year's deficit, the agency announced yesterday.

The MBTA's deficit was $30 million in FY2017 versus $86 million in FY2016. In addition, core operating expenses for the most recent fiscal year were $6 million less than they were in the prior year.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

Port of Oakland OKs rail spur project

Rail News Home Union Pacific Railroad 10/3/2017 Rail News: Union Pacific Railroad
Cool Port is a 280,000-square-foot distribution center now under construction on 25 acres of Port of Oakland propertyPhoto – Port of Oakland

Port of Oakland Commissioners last week approved an $11 million rail-spur project that would connect Union Pacific Railroad tracks with Cool Port.

Cool Port is a 280,000-square-foot distribution center now under construction on 25 acres of Port of Oakland property. BNSF Railway Co. also will have access. 

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

Port of Oakland OKs rail spur project

Rail News Home Union Pacific Railroad 10/3/2017 Rail News: Union Pacific Railroad
Cool Port is a 280,000-square-foot distribution center now under construction on 25 acres of Port of Oakland propertyPhoto – Port of Oakland

Port of Oakland Commissioners last week approved an $11 million rail-spur project that would connect Union Pacific Railroad tracks with Cool Port.

Cool Port is a 280,000-square-foot distribution center now under construction on 25 acres of Port of Oakland property. BNSF Railway Co. also will have access. 

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

Port of Oakland looking to “beef” up rail infrastructure

You asked for , but despite our computers looking very hard, we could not find it. What happened ?

the link you clicked to arrive here has a typo in itor somehow we removed that page, or gave it another nameor, quite unlikely for sure, maybe you typed it yourself and there was a little mistake ?

Original author: Mischa Wanek-Libman, editor

Copyright

© © TradePress Media Group, Inc.

Oct
03

Port of Oakland looking to “beef” up rail infrastructure

You asked for , but despite our computers looking very hard, we could not find it. What happened ?

the link you clicked to arrive here has a typo in itor somehow we removed that page, or gave it another nameor, quite unlikely for sure, maybe you typed it yourself and there was a little mistake ?

Original author: Mischa Wanek-Libman, editor

Copyright

© © TradePress Media Group, Inc.

Oct
03

Port of Oakland looking to “beef” up rail infrastructure

You asked for , but despite our computers looking very hard, we could not find it. What happened ?

the link you clicked to arrive here has a typo in itor somehow we removed that page, or gave it another nameor, quite unlikely for sure, maybe you typed it yourself and there was a little mistake ?

Original author: Mischa Wanek-Libman, editor

Copyright

© © TradePress Media Group, Inc.

Oct
03

California high-speed project meets ARRA funding deadline

The California High-Speed Rail Authority (CHSRA) says it has met federal American Recovery and Reinvestment Act (ARRA) of 2009 requirements by fully investing the more than $2.55 billion granted to the state since 2009 to build the nation's first high-speed rail system.

CHSRA explains that these funds have helped to create thousands of new jobs and generated approximately $4 billion in economic activity in the Central Valley and across California.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

California high-speed project meets ARRA funding deadline

The California High-Speed Rail Authority (CHSRA) says it has met federal American Recovery and Reinvestment Act (ARRA) of 2009 requirements by fully investing the more than $2.55 billion granted to the state since 2009 to build the nation's first high-speed rail system.

CHSRA explains that these funds have helped to create thousands of new jobs and generated approximately $4 billion in economic activity in the Central Valley and across California.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

California high-speed project meets ARRA funding deadline

The California High-Speed Rail Authority (CHSRA) says it has met federal American Recovery and Reinvestment Act (ARRA) of 2009 requirements by fully investing the more than $2.55 billion granted to the state since 2009 to build the nation's first high-speed rail system.

CHSRA explains that these funds have helped to create thousands of new jobs and generated approximately $4 billion in economic activity in the Central Valley and across California.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

London Trackwork awarded supply contract for Edmonton Valley Line

London Trackwork Inc. has been awarded the supply contract for the Valley Line LRT project in Edmonton, Alberta.

The company will embed 42,720 linear meters of rail using Icosit rail grout. According to London Trackwork's website, the rail grout is "designed as load-bearing, flexible leveling grout for elastic fixing of grooved rail (girder rail) or T-rails on concrete slabs, steel bridge decks and in tunnels."

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

London Trackwork awarded supply contract for Edmonton Valley Line

London Trackwork Inc. has been awarded the supply contract for the Valley Line LRT project in Edmonton, Alberta.

The company will embed 42,720 linear meters of rail using Icosit rail grout. According to London Trackwork's website, the rail grout is "designed as load-bearing, flexible leveling grout for elastic fixing of grooved rail (girder rail) or T-rails on concrete slabs, steel bridge decks and in tunnels."

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
03

London Trackwork awarded supply contract for Edmonton Valley Line

London Trackwork Inc. has been awarded the supply contract for the Valley Line LRT project in Edmonton, Alberta.

The company will embed 42,720 linear meters of rail using Icosit rail grout. According to London Trackwork's website, the rail grout is "designed as load-bearing, flexible leveling grout for elastic fixing of grooved rail (girder rail) or T-rails on concrete slabs, steel bridge decks and in tunnels."

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
02

Chicago Transit Authority marks 70th anniversary

Rail News Home Passenger Rail 10/2/2017 Rail News: Passenger Rail
The agency was created by the Illinois Legislature to consolodate several privately owned transit companies.Photo – transitchicago.com

The Chicago Transit Authority (CTA) yesterday marked its 70th anniversary.

The agency was created by the Illinois Legislature to consolidate several privately owned companies that operated transit lines in the Chicago area. Before the CTA was created, those struggling companies competed with each other for riders, according to an announcement on the agency's website.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
02

Cleveland transit agency names Caver deputy GM of operations

The Greater Cleveland Regional Transit Authority (GCRTA) has appointed Floun'say Caver as deputy general manager of operations.

Caver fills the position vacated by Michael York, who retired last week. Caver joined GCRTA in 2000 and left in 2002 to earn a doctorate degree from the University of Texas at Dallas. He returned in 2006 as GCRTA's manager of budgets.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
02

NARP: Amtrak long-distance trains boost local, national economies

Ending funding of Amtrak long-distance routes would disproportionately affect low income households in rural communities across the country, according to a report released today by the National Association of Railroad Passengers (NARP).

NARP's "Dismantling a National Transportation Network" report was issued in response to President Donald Trump's fiscal-year 2018 budget proposal earlier this year that called for cutting funding to certain long-distance routes in Amtrak's national network.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
02

KC Streetcar Authority advances riverfront extension plans

Rail News Home Passenger Rail 10/2/2017 Rail News: Passenger Rail
Conceptual rendering streetcar's riverfront extension.Photo – Burns & McDonnell and WSP Parsons Brinckerhoff

The Kansas City Streetcar Authority (KCSA) late last week approved advancing to the next phase of technical work for a streetcar extension to the Missouri River.

The next planning phase will focus on completing conceptual design for the project, KCSA officials said in a press release. Other efforts will include survey work and utility location, estimating costs, performing an environmental assessment and conducting public outreach.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
02

Post-hurricane draft restrictions lifted at Port of Corpus Christi

Rail News Home Intermodal 10/2/2017 Rail News: Intermodal
The first vessel after Hurricane Harvey arrived at the Inner Harbor on Aug. 31.Photo – Port of Corpus Christi

The U.S. Coast Guard last week lifted draft restrictions at the Port of Corpus Christi, although recovery efforts continue at the port after it was impacted by Hurricane Harvey in late August.

The full 47-foot draft of the ship channel is open to vessels, and the daylight-only transit restriction was removed. Vessel traffic remains one way on the Corpus Christi Ship Channel; all other restrictions have been lifted, port officials said in a press release.

Continue reading

Copyright

© © TradePress Media Group, Inc.

Oct
02

Construction authority OKs contract for L.A. Metro Gold Line light-rail extension

Rail News Home Passenger Rail 10/2/2017 Rail News: Passenger Rail
The Gold Line extension to Azusa, California, opened in 2016.Photo – L.A. Metro's blog

The Foothill Gold Line Construction Authority's board has awarded a $2.6 million utility relocation design-bid-build contract to W.A. Rasic Construction Co. Inc. for a 12.3-mile light-rail project between Glendora and Montclair, California.

The contract is the first of two to be procured as part of the $1.4 billion Glendora-to-Montclair segment, which will extend the Los Angeles County Metropolitan Transportation Authority's (Metro) Gold Line route through communities in the San Gabriel Valley and into San Bernardino County.

Continue reading

Copyright

© © TradePress Media Group, Inc.